01

Protect the surfaces that matter

For valve stem shipments, protect exposed threads, bearing surfaces and connection ends from contact during handling. Keep parts separated and prevent movement inside the package; long stems may also need support along their length. Agree the protection and support arrangement for the actual parts and transport conditions.

State any cleanliness, moisture-protection or surface-treatment restrictions before packing. A protective material should be compatible with the specified finish and the receiving process. The choice of cartons, wooden crates or other packaging is confirmed for the actual order, not inferred from a general dispatch photograph.

02

Keep parts and drawing revisions identifiable

Agree how each model, drawing revision and batch will be identified. For mixed shipments, the packing list should make it possible to match the component reference and quantity to each package. Identify any separate samples and documents so they can be found without unpacking every crate.

Useful details to confirm include the purchase-order reference, part number, drawing revision, quantity per package and package sequence. If material or inspection documents are required, agree their connection to the delivered batch before dispatch. This is particularly useful when several similar valve stem and shaft references are ordered together.

03

Confirm packing and dispatch requirements

Share the destination, transport arrangement and handling constraints with the inquiry. Confirm the agreed packing method, package dimensions and weight information when available. Any special shipping marks or destination-specific packaging requirements need review before the shipment is prepared.

Availability and delivery timing depend on the actual component, quantity and production plan. The factory photographs below show previous loading and shipment preparation; they are not live stock evidence for a particular model. See factory packing and dispatch photographs for further context.

04

Use a valve stem receiving checklist

Use a receiving check to connect the delivered packages with the agreed order. Complete the package and document checks first, then follow the part-inspection plan.

  1. Before unpacking. Record the delivery date, package number and visible condition. Photograph any damaged packaging and its identification together.

  2. While identifying parts. Match the purchase order, part number, drawing revision and quantity to the packing list. Keep similar-looking shaft references and different revisions separated.

  3. Before acceptance. Check the condition of threads, journals and connection ends, and match required material or inspection documents to the batch. Follow the agreed measurement and sampling plan; packaging condition alone does not confirm dimensional conformity.

  4. If a discrepancy appears. Record the affected part or package reference, quantity, photographs and the specific drawing requirement. Keep the affected items identified while the delivery or quality question is reviewed.

For a gate valve stem order, pair these receiving checks with the stem inspection record checklist. Agree any handling or storage requirements that apply after unpacking. To discuss a new shipment, send the part reference, quantity and packing requirements with your drawing or sample details.

Photographs from the Vanxon factory material collection.

Crates inside the container
Shipment preparation

Send your drawing and requirements

Start an inquiry